One train shut at Australia’s Ichthys LNG plant
8/23/2024
One of the two trains at the Ichthys liquefied natural gas (LNG) plant in Darwin, Australia, has been shut since August 20, operator Inpex Corp. said in an emailed statement on Thursday.
"Train 2 at Ichthys LNG was temporarily halted on the evening of August 20. The impact is currently being evaluated," Inpex said.
This is the plant's second train outage in the past month, after an outage in July.
Ichthys LNG is a joint venture between Inpex, TotalEnergies, and the Australian subsidiaries of CPC Corporation Taiwan, Osaka Gas, Kansai Electric Power, JERA and Toho Gas 9533.T.
The plant's processing trains can produce 8.9 metric MMtpy of LNG.
Related News
Related News
Sign up to Receive Our Newsletter

- Three killed, two injured in accident at LNG construction site in Texas (U.S.)
- U.S. ethane exports to China hit new roadblock with license requirement
- Update: How Germany is building up LNG import terminals
- Digital Exclusive: The value of experience—Why expertise matters in compressor overhauls and revamps
- Croatia's LNG terminal to auction 0.75 Bm3 of regasification capacity in May
Comments