Morocco to tender for floating LNG terminal
RABAT (Reuters)—Morocco plans to launch a tender this summer to build a floating liquefied natural gas (LNG) terminal in the northeastern Nador West Med port, the energy ministry's head of oil and gas said on Friday.
The ministry expects to reach financial close in 2025 with construction, commissioning and commercial operations due in 2026, Abdelghafour El Hadjaoui said in a presentation seen by Reuters.
The LNG terminal will be connected to an existing pipeline that helps Morocco import 0.5 Bm3y of LNG from Spanish terminals, enough to power two small electricity production plants.
Morocco also plans to connect the same pipeline to developing gas fields in its east and west. Morocco's natural gas needs are expected to increase to 8 Bm3y in 2027 from 1 Bm3y currently, according to ministry estimates.
Nador West Med is a deepwater port under construction with expected capacity of 3.5 MM containers.
(Reporting by Ahmed EljechtimiEditing by David Goodman and Mark Potter)
Related News
Related News

- Biogas in France: TotalEnergies starts its 2nd largest unit in Normandy
- ONEOK announces joint ventures with MPLX to build LPG export terminal at U.S. Gulf Coast location
- Ukraine plans to import 800 MMm3 of gas until April after Russian strikes
- Parker Hannifin joins iHAPC project to test H2 and argon for cleaner and more energy-efficient engine technologies
- India's BPCL signs LPG supply deal with Norway's Equinor
Comments