GTT receives order for LNG tank design from Samsung Heavy Ind
1/18/2021
Paris - GTT has received an order from the Korean shipyard Samsung Heavy Industries (SHI) for the tank design of a new 174,000 m3 LNGC1 on behalf of the Korean ship-owner Pan Ocean.
GTT will design the tank, which will be fitted with the Mark III Flex membrane containment system. The delivery of this vessel is scheduled for the second quarter of 2023.
This order is the first of the year for GTT. It follows a series of 29 LNG carriers orders received in the second half of 2020. GTT recalls that these orders, except for one, will be delivered over a longer period than usual, spreading over 2023 to 2025.
Sign up to Receive Our Newsletter
- Mitsubishi Heavy Industries Compressor acquires Swiss rotating equipment maintenance company AST Turbo AG
- Digital Exclusive: Evolving pressure relief valve designs protect LNG facilities
- Qatar’s Ras Laffan LNG hub hit by missile attack, ‘extensive damage’ reported
- JGC-Hyundai JV awarded EPC contract for major low-carbon LNG plant project in Papua New Guinea
- Iran attacks wipe out 17% of Qatar’s LNG capacity for up to five years

Comments