Uniper agrees LNG bookings at Wilhelmshaven with ExxonMobil
1/25/2019
FRANKFURT, (Reuters) - German utility Uniper on Friday said it entered into a preliminary contract for the long-term booking of a substantial share of regasification capacity at a terminal yet to be built at Wilhelmshaven for receiving liquefied natural gas (LNG).
Discussions about LNG have flared up recently as the German government wants to diversify away from pipeline gas arriving from Russia, Norway and the Netherlands. Suppliers, most notably Qatar and the United States, have expressed interest.
The 10 billion cubic metres facility, a floating storage and regasification (FSRU) unit, could go into operation in second half of 2022.
Reporting by Vera Eckert, editing by Thomas Seythal
Sign up to Receive Our Newsletter
- Mitsubishi Heavy Industries Compressor acquires Swiss rotating equipment maintenance company AST Turbo AG
- Digital Exclusive: Evolving pressure relief valve designs protect LNG facilities
- Qatar’s Ras Laffan LNG hub hit by missile attack, ‘extensive damage’ reported
- JGC-Hyundai JV awarded EPC contract for major low-carbon LNG plant project in Papua New Guinea
- Iran attacks wipe out 17% of Qatar’s LNG capacity for up to five years

Comments