Dutch gas sector regulator recommends steep cut in Groningen production
2/1/2018
THE HAGUE (Reuters) - Gas production in the Dutch Groningen field should be cut nearly in half "as soon as possible" to limit the risks of earthquakes in the region, the Dutch gas sector regulator said on Thursday.
In its recommendation to the government, regulator SodM said production in Groningen should be limited to 12 billion cubic metres (bcm) per year, from the current cap of 21.6 bcm.
The regulator said it expects production to be cut further in the future, with a total shutdown possible if necessary, after the northern Dutch region was hit by the strongest earthquake in years last month.
(Reporting by Bart Meijer; Editing by Anthony Deutsch and Adrian Croft)
Sign up to Receive Our Newsletter
- Mitsubishi Heavy Industries Compressor acquires Swiss rotating equipment maintenance company AST Turbo AG
- Digital Exclusive: Evolving pressure relief valve designs protect LNG facilities
- Qatar’s Ras Laffan LNG hub hit by missile attack, ‘extensive damage’ reported
- JGC-Hyundai JV awarded EPC contract for major low-carbon LNG plant project in Papua New Guinea
- Iran attacks wipe out 17% of Qatar’s LNG capacity for up to five years

Comments