GTT to design LNG tanks of new Hyundai Heavy Industries FSRU
9/18/2017
PARIS — GTT has received an order from the South Korean Shipyard Hyundai Heavy Industries. The order concerns a new Floating Storage and Regasification Unit (FSRU) which has been contracted by Triumph Offshore, a subsidiary of the Indian ship-owner Swan Energy.
![]() |
| Photo courtesy of HHI. |
Its delivery is scheduled in late 2019.
GTT will design the LNG integrated tanks which represent a total capacity of 180,000 m3. These tanks will be equipped with the membrane containment system Mark III, a sea-proven technology developed by GTT.
This insulation system benefits from an unparalleled track record: it has been already used to equip more than 140 vessels which are still in service today.
Sign up to Receive Our Newsletter
- Mitsubishi Heavy Industries Compressor acquires Swiss rotating equipment maintenance company AST Turbo AG
- Digital Exclusive: Evolving pressure relief valve designs protect LNG facilities
- Qatar’s Ras Laffan LNG hub hit by missile attack, ‘extensive damage’ reported
- JGC-Hyundai JV awarded EPC contract for major low-carbon LNG plant project in Papua New Guinea
- Iran attacks wipe out 17% of Qatar’s LNG capacity for up to five years


Comments