GTT to design LNG tanks of new Hyundai Heavy Industries FSRU
9/18/2017
PARIS — GTT has received an order from the South Korean Shipyard Hyundai Heavy Industries. The order concerns a new Floating Storage and Regasification Unit (FSRU) which has been contracted by Triumph Offshore, a subsidiary of the Indian ship-owner Swan Energy.
Photo courtesy of HHI. |
Its delivery is scheduled in late 2019.
GTT will design the LNG integrated tanks which represent a total capacity of 180,000 m3. These tanks will be equipped with the membrane containment system Mark III, a sea-proven technology developed by GTT.
This insulation system benefits from an unparalleled track record: it has been already used to equip more than 140 vessels which are still in service today.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Golar LNG signs EPC deal for $2.2-B MK II FLNG conversion project
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Fincantieri LNG-powered Star Princess launched in Monfalcone
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments