GTT to design LNG tanks of new Hyundai Heavy Industries FSRU
9/18/2017
PARIS — GTT has received an order from the South Korean Shipyard Hyundai Heavy Industries. The order concerns a new Floating Storage and Regasification Unit (FSRU) which has been contracted by Triumph Offshore, a subsidiary of the Indian ship-owner Swan Energy.
![]() |
| Photo courtesy of HHI. |
Its delivery is scheduled in late 2019.
GTT will design the LNG integrated tanks which represent a total capacity of 180,000 m3. These tanks will be equipped with the membrane containment system Mark III, a sea-proven technology developed by GTT.
This insulation system benefits from an unparalleled track record: it has been already used to equip more than 140 vessels which are still in service today.
Sign up to Receive Our Newsletter
- ExxonMobil halts 1-Bft3d blue hydrogen project in Texas
- Aramco and Yokogawa commission multiple autonomous control AI agents at Fadhili gas plant
- Ukraine will resume gas imports via Transbalkan route in November
- Mitsubishi to inject $260 MM into Brunei LNG project
- Freeport LNG (U.S.) on track to take in more natgas on Thursday after unit outage


Comments