TechnipFMC awarded iEPCI contract by Woodside Energy for Xena Phase 3 development
TechnipFMC has been awarded an integrated engineering, procurement, construction and installation (iEPCI) contract by Woodside Energy in Australia.
TechnipFMC will design, manufacture, and install the subsea production system, flexible pipe and umbilicals for the Xena Infill well (XNA03) to support ongoing production from the Pluto LNG Project. The award follows an integrated front-end engineering design (iFEED) study.
The project will use the Company’s Subsea 2.0 production system. Xena Phase 3 will be tied back to existing subsea infrastructure previously supplied by TechnipFMC.
Jonathan Landes, President, Subsea at TechnipFMC, commented: “We are proud to be delivering a fully integrated project from concept to execution. This project will help our long-term client meet their objectives, demonstrating the favorable impact iFEED, iEPCI and Subsea 2.0® can have on project economics.”
The contract is the latest call-off on the framework agreement between Woodside Energy and TechnipFMC.
Related News
Related News

- U.S. ethane exports to China hit new roadblock with license requirement
- Australia clears Woodside to run North West Shelf LNG plant to 2070
- Egypt agrees to buy up to 160 LNG cargoes through 2026
- Shell to add up to 12 MMt of additional LNG capacity by 2030
- Siemens and TURN2X join forces to scale up green energy production
Comments