TechnipFMC awarded iEPCI contract by Woodside Energy for Xena Phase 3 development
TechnipFMC has been awarded an integrated engineering, procurement, construction and installation (iEPCI) contract by Woodside Energy in Australia.
TechnipFMC will design, manufacture, and install the subsea production system, flexible pipe and umbilicals for the Xena Infill well (XNA03) to support ongoing production from the Pluto LNG Project. The award follows an integrated front-end engineering design (iFEED) study.
The project will use the Company’s Subsea 2.0 production system. Xena Phase 3 will be tied back to existing subsea infrastructure previously supplied by TechnipFMC.
Jonathan Landes, President, Subsea at TechnipFMC, commented: “We are proud to be delivering a fully integrated project from concept to execution. This project will help our long-term client meet their objectives, demonstrating the favorable impact iFEED, iEPCI and Subsea 2.0® can have on project economics.”
The contract is the latest call-off on the framework agreement between Woodside Energy and TechnipFMC.
Related News
Related News

- EnviTec Biogas looks to expand biogas production into the U.S.
- Biogas in France: TotalEnergies starts its 2nd largest unit in Normandy
- ONEOK announces joint ventures with MPLX to build LPG export terminal at U.S. Gulf Coast location
- Ukraine plans to import 800 MMm3 of gas until April after Russian strikes
- Trump lifts freeze on U.S. LNG export permit applications
Comments