China approves new LNG receiving terminal in Fujian province
China's state economic planner has approved natural gas company Hanas Group's plan to build a receiving terminal for LNG in the southeastern province of Fujian.
The terminal, estimated to cost 5.26 B yuan ($829.8 MM), will have an annual receiving capacity of 5.65 MMt of the super-chilled fuel, the National Development and Reform Commission said on Wednesday.
The terminal, to be built in Meizhouwan port of Fujian province, will have one berth and two storage tanks each sized 200,000 m3, the planner said in a statement posed on its website.
Based in the city of Yinchuan in the northern region of Ningxia, Hanas Group is engaged in piped-gas distribution, natural gas liquefaction and power generation.
(Reporting by Chen Aizhu; Editing by Christian Schmollinger and Stephen Coates)
- ADNOC Gas awards $2.1 B in contracts to enhance LNG supply infrastructure
- U.S. Department of the Treasury releases final rules for clean hydrogen production tax credit
- Tecnimont to build waste-to-biogas plant to fuel local kitchens in India
- Indonesia regulator confirms disruption at bp's Tangguh LNG project
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
Comments