GTT entrusted by Daewoo with the tank design for two new LNG carriers
12/20/2021
GTT announces that it has received an order from its partner the Korean shipyard Daewoo Shipbuilding & Marine Engineering for the tank design of two new LNG carriers.
As part of this order, GTT will design the tanks of the vessels, which will each offer a capacity of 174,000 m3. The LNG carrier tanks will be fitted with the GTT NO96 GW membrane containment system.
Deliveries of the vessels are scheduled during first half 2025.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
Comments