Gazprom to sign memo with Linde for third line of Ust-Luga LNG plant
12/24/2021
The board of Russia's Gazprom has approved signing a memorandum with Linde and RusKhimAlyans to build a third line at a LNG plant at the Baltic Sea port of Ust-Luga, Gazprom said on Friday.
The LNG plant is a part of a gas chemical complex that will include a plant with annual capacity to process 45 Bm3 of gas and a 13 MMtpy LNG plant. The complex is expected to start production in 2024-2025.
Sign up to Receive Our Newsletter
- ADNOC Gas awards $2.1 B in contracts to enhance LNG supply infrastructure
- U.S. Department of the Treasury releases final rules for clean hydrogen production tax credit
- Tecnimont to build waste-to-biogas plant to fuel local kitchens in India
- Indonesia regulator confirms disruption at bp's Tangguh LNG project
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
Comments