TC Energy announces $800-MM WR project
TC Energy Corporation announced today that it has approved its WR Project, a set of projects anticipated to constitute a total capital investment of approximately $0.8 B. The Project is designed to increase base system reliability and expand an existing portion of the ANR Pipeline Company (ANR) system to serve markets in the midwestern U.S., while lowering emissions by approximately 30,000 metric t CO2e (carbon dioxide equivalent) per yr – the equivalent to removing more than 6,500 passenger vehicles from the road annually.
By expanding its system, ANR will be able to provide up to an incremental 157,000 dekatherms per day of natural gas capacity to local area distribution and electric generation companies in markets that have recently announced significant coal fired and vintage gas generation retirements. ANR has secured long-term firm transportation agreements to meet energy demand in the Midwest, which helped support TC Energy's approval of the Project. The Project’s facilities include, in part, the installation of electric motor compressors with fuel switching capabilities for additional reliability to replace existing natural gas-powered compressor units along ANR’s system.
“The electrification of horsepower for the Project is expected to result in approximately 43% reduction in carbon dioxide equivalent emissions at the source with full utilization of the electric drive units — consistent with TC Energy’s approach to optimize our existing footprint with more sustainable infrastructure while improving reliability and organically growing our business along our existing corridor,” said François Poirier, TC Energy’s President and Chief Executive Officer.
Planned further conversion of natural gas to electric motor compressors in the coming yr is expected to continue the trend of minimizing emissions from our natural gas transmission and storage facilities.
The WR Project is expected to be brought in service in the fourth quarter of 2025.
- McDermott awarded Rovuma LNG Phase 1 FEED contract in Mozambique
- Wood leads industry project to accelerate CCUS with guidelines for CO2 specifications
- ExxonMobil selects Chart Industries’ IPSMR® liquefaction technology for Mozambique LNG project
- Gasum selects Wärtsilä for another bio-LNG project in Sweden
- Vaisala seeks to remove greenwashing from carbon capture with new measurement solution
Comments