GTT secures tank design order for three new LNG carriers
4/19/2021
GTT received an order from its partner the Korean shipyard Hyundai Heavy Industries (HHI) for the tank design of three new LNGCs1 on behalf of an Asian ship-owner.
As part of this order, GTT will design the tanks of the vessels which will offer a capacity of 174,000 m3. The LNGC tanks will be fitted with the GTT Mark III Flex membrane containment system.
Deliveries of the vessels are scheduled between the second and third quarter of 2024.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
Comments