GTT receives order for tank design of a new LNG carrier
2/8/2021
GTT announced that it has received an order from its partner the Korean shipyard Hyundai Samho Heavy Industries (HSHI) for the tank design of a new LNGC1.
As part of this order, GTT will design the tanks of a 174,000 m3 LNGC. The LNGC tanks will be fitted with the GTT Mark III Flex membrane containment system.
The delivery of the vessel is scheduled for the second quarter of 2023.
Sign up to Receive Our Newsletter
- ADNOC Gas awards $2.1 B in contracts to enhance LNG supply infrastructure
- U.S. Department of the Treasury releases final rules for clean hydrogen production tax credit
- Tecnimont to build waste-to-biogas plant to fuel local kitchens in India
- Indonesia regulator confirms disruption at bp's Tangguh LNG project
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
Comments