GTT receives an order from Hyundai Heavy Industries for the design of the tanks of two new LNG Carriers
12/7/2020
GTT has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) for the tank design of two LNGCs on behalf of a European shipowner.
Each vessel will offer a capacity of 174,000 m3. GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system. Deliveries of the vessels are scheduled for the fourth quarter of 2022 and the third quarter of 2023 respectively.
Philippe Berterottière, Chairman and CEO of GTT, declared: "We are pleased with the confidence placed in us by HHI, a partner with whom GTT has developed a long-term collaboration.”
Sign up to Receive Our Newsletter

- U.S. ethane exports to China hit new roadblock with license requirement
- Australia clears Woodside to run North West Shelf LNG plant to 2070
- Egypt agrees to buy up to 160 LNG cargoes through 2026
- Shell to add up to 12 MMt of additional LNG capacity by 2030
- Siemens and TURN2X join forces to scale up green energy production
Comments