GTT receives an order from Hyundai Heavy Industries for the design of the tanks of two new LNG Carriers
12/7/2020
GTT has received an order from the Korean shipyard Hyundai Heavy Industries (HHI) for the tank design of two LNGCs on behalf of a European shipowner.
Each vessel will offer a capacity of 174,000 m3. GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system. Deliveries of the vessels are scheduled for the fourth quarter of 2022 and the third quarter of 2023 respectively.
Philippe Berterottière, Chairman and CEO of GTT, declared: "We are pleased with the confidence placed in us by HHI, a partner with whom GTT has developed a long-term collaboration.”
Sign up to Receive Our Newsletter
- ExxonMobil halts 1-Bft3d blue hydrogen project in Texas
- Aramco and Yokogawa commission multiple autonomous control AI agents at Fadhili gas plant
- Ukraine will resume gas imports via Transbalkan route in November
- Mitsubishi to inject $260 MM into Brunei LNG project
- Freeport LNG (U.S.) on track to take in more natgas on Thursday after unit outage

Comments