GTT entrusted by DSME with the design of a FSRU for MOL
6/9/2020
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the design of a new floating storage and regasification unit (FSRU1) on behalf of the Japanese ship-owner Mitsui OSK Lines Ltd. (MOL).
The FSRU with a capacity of 263,000 m3 will be fitted with the NO96 membrane cryogenic containment system, a technology developed by GTT. The vessel delivery is scheduled in 2023. It will be located in Wilhelmshaven, Germany.
"We are delighted to be working with DSME and MOL, two very long-term partners, on this new very large capacity FSRU project," Philippe Berterottière, Chairman and CEO of GTT, said.
Sign up to Receive Our Newsletter
- RWE strengthens partnerships with ADNOC and Masdar to enhance energy security in Germany and Europe
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project
- Venture Global wins LNG arbitration case brought by Spain's Repsol
- KBR awarded FEED for Coastal Bend LNG project
- Norway pipeline gas export down 2.3% in 2025, seen steady this year

Comments