Indonesia's Bontang LNG plant offers 3 cargoes for Feb-April
1/21/2020
Indonesia’s Bontang liquefied natural gas (LNG) plant has offered three cargoes for loading over February to April, two trade sources said.
The cargoes are for loading over the second half of February, March and April, one of the sources said, adding that they were offered on a free-on-board (FOB) basis. (Reporting by Jessica Jaganathan; Editing by Clarence Fernandez)
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments