GTT receives an order from DSME for the tank design of one new LNG Carrier
1/7/2020
GTT received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) concerning the tank design of one new 174,000 m3 LNG Carrier (LNGC1) on behalf of a European ship-owner.
GTT's membrane containment system NO96 GW has been selected for the design of the tanks. The delivery of the ship is planned in early 2022.
Philippe Berterottière, Chairman and CEO of GTT, commented: "We are very pleased to continue our partnership of excellence with DSME with this new order."
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments