Chevron's Gorgon LNG export plant train 3 in Australia back online
SINGAPORE, (Reuters) - Chevron Corp’s Gorgon liquefied natural gas (LNG) export plant in Australia brought its train 3 back online over the weekend after an unplanned outage, two industry sources said.
The train had been shut since mid-January to address a mechanical issue, the company had said earlier.
The three-train Gorgon project, one of the world’s largest natural gas projects, can produce 15.6 million tonnes of LNG annually from its three trains, according to Chevron’s website.
Chevron is the Gorgon project operator, with its Australian subsidiary holding a controlling 47.3 percent. Exxon Mobil Corp and Royal Dutch Shell each have a 25 percent share, and the rest is held by Japan’s Osaka Gas, Tokyo Gas and JERA.
Reporting by Jessica Jaganathan; Editing by Joseph Radford
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments