Chevron's Gorgon LNG export plant train 3 in Australia back online
SINGAPORE, (Reuters) - Chevron Corp’s Gorgon liquefied natural gas (LNG) export plant in Australia brought its train 3 back online over the weekend after an unplanned outage, two industry sources said.
The train had been shut since mid-January to address a mechanical issue, the company had said earlier.
The three-train Gorgon project, one of the world’s largest natural gas projects, can produce 15.6 million tonnes of LNG annually from its three trains, according to Chevron’s website.
Chevron is the Gorgon project operator, with its Australian subsidiary holding a controlling 47.3 percent. Exxon Mobil Corp and Royal Dutch Shell each have a 25 percent share, and the rest is held by Japan’s Osaka Gas, Tokyo Gas and JERA.
Reporting by Jessica Jaganathan; Editing by Joseph Radford
- ADNOC Gas awards $2.1 B in contracts to enhance LNG supply infrastructure
- U.S. Department of the Treasury releases final rules for clean hydrogen production tax credit
- Tecnimont to build waste-to-biogas plant to fuel local kitchens in India
- Indonesia regulator confirms disruption at bp's Tangguh LNG project
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
Comments