China's Sinopec adds LNG tank at Tianjin terminal
BEIJING, (Reuters) China’s Sinopec Corp completed adding a third tank to store liquefied natural gas at its receiving terminal in Tianjin, marking the completion of construction of the first phase of the import facility, the state oil and gas group said.
The terminal, in the northern port city Tianjin, near Beijing, began operations last February. It has an annual receiving capacity of 3 million tonnes and an annual supply capacity of 4 billion cubic metres (bcm).
The terminal has so far this year received 22 shipments of LNG that totalled 1.46 million tonnes in volume. It has delivered 1.46 bcm of the fuel by pipeline and 339,000 tonnes by gas trailers, the company said.
Sinopec operates two other terminals, one in Beihai in the southwest Guangxi region and one in Qingdao in the eastern province of Shandong.
The Chinese government has asked gas suppliers and distributors to boost storage capacity to cope with winter demand spikes.
Reporting by Chen Aizhu
- ADNOC Gas awards $2.1 B in contracts to enhance LNG supply infrastructure
- U.S. Department of the Treasury releases final rules for clean hydrogen production tax credit
- Tecnimont to build waste-to-biogas plant to fuel local kitchens in India
- Indonesia regulator confirms disruption at bp's Tangguh LNG project
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
Comments