Amec Foster Wheeler wins Hyundai Engineering contract for GTL plant in Uzbekistan
LONDON – Amec Foster Wheeler has been awarded a lump sum contract by Hyundai Engineering Co. Ltd for the delivery of hydrogen plant technology and design and materials supply for a Terrace Wall steam reformer heater for Uzbekneftegaz National Holding Company’s OLTIN YO’L gas-to-liquid (GTL) plant, which is under construction in the Kashkadarya Region of Uzbekistan.
Amec Foster Wheeler’s scope of work includes the basic design engineering for the 37,100 Nm3/h hydrogen unit, the basic and detailed engineering, and procurement for the steam reformer heater, plus site advisory services. Amec Foster Wheeler is currently in the detailed engineering phase for the plant's Terrace Wall steam reformer, which is scheduled to be completed in the second quarter of 2018.
The Terrace Wall design is a unique and fully proven global technology, part of Amec Foster Wheeler’s wider suite of innovative technologies which supports customers across the world. In addition to this contract win, in the last year Amec Foster Wheeler has announced contracts for its proprietary Terrace Wall reformer technology in Russia, Egypt and Italy.
- ADNOC Gas awards $2.1 B in contracts to enhance LNG supply infrastructure
- U.S. Department of the Treasury releases final rules for clean hydrogen production tax credit
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
- Nicor Gas celebrates its first renewable natural gas interconnection
- Phillips 66 outlines nearly $3-B capital program for 2025
Comments