Shell's floating LNG facility sets sail from South Korea for Australia
6/29/2017
LONDON (Reuters) — Royal Dutch Shell's Prelude floating liquefied natural gas (FLNG) ship has left a shipyard in South Korea for its destination offshore northwest Australia, the company said on Thursday.
![]() |
| Photo courtesy of Shell. |
Shell's $12.6 B Prelude project is expected to start operating next year, the company said, after long delays since the oil major first decided to go ahead with the project in 2011.
Once the facility arrives in Australia, it will be secured to the seabed by mooring chains before it can be connected to the gas field and start operating, Shell said.
The Prelude FLNG was built by a Technip Samsung Heavy Industries consortium in the South Korean shipyard of Geoje.
Reporting by Karolin Schaps; Editing by Elaine Hardcastle
Sign up to Receive Our Newsletter
- ExxonMobil halts 1-Bft3d blue hydrogen project in Texas
- Aramco and Yokogawa commission multiple autonomous control AI agents at Fadhili gas plant
- Ukraine will resume gas imports via Transbalkan route in November
- Mitsubishi to inject $260 MM into Brunei LNG project
- Freeport LNG (U.S.) on track to take in more natgas on Thursday after unit outage


Comments