Supplies from Russia's sanctioned Arctic LNG 2 plant curbed by lack of tankers
Russia's Arctic LNG 2 plant, currently under U.S. sanctions, has shut down its first production train because reservoirs are full in the absence of tankers to load, a source close to the matter said on Friday.
Russia's Novatek, which owns a 60% stake in the plant, did not respond to a request for comment.
Located on the Gydan peninsula that juts into the Kara Sea, the plant had been set to become one of Russia's largest LNG plants, with eventual output of 19.8 metric MMtpy between three trains.
Shortages of ice-class gas ships and Western sanctions over Russia's war in Ukraine has left Novatek behind schedule for cargoes of the super-chilled gas.
Novatek has said that 15 Arc7 ice-class tankers to transport LNG from Arctic projects will be built at the Zvezda shipyard.
The source said on Friday that the first Arc7 from Zvezda is expected to be delivered to Russia's leading tanker group, Sovcomflot, between August and September.
Related News
Related News

- Three killed, two injured in accident at LNG construction site in Texas (U.S.)
- U.S. ethane exports to China hit new roadblock with license requirement
- Glencore to offtake 2 MMtpy of LNG from Commonwealth LNG's export facility in Cameron Parish, Louisiana
- Woodside approves $17.5-B U.S. LNG project, targets 2029 start
- Germany's Wilhelmshaven LNG terminal closed for repair work
Comments