Gas Processing & LNG is Produced by Gulf Publishing Holdings LLC



TurkStream gas pipeline officially launched in grand ceremony

Gazprom celebrated the grand opening ceremony for the TurkStream gas pipeline. Attending the event were Vladimir Putin, President of the Russian Federation, Recep Tayyip Erdogan, President of the Republic of Turkey, Aleksandar Vucic, President of the Republic of Serbia, Boyko Borissov, Prime Minister of the Republic of Bulgaria, Alexander Novak, Minister of Energy of the Russian Federation, Fatih Donmez, Minister of Energy and Natural Resources of Turkey, and Alexey Miller, Chairman of the Gazprom Management Committee. Burhan Ozcan, Chairman of the Board and General Manager at BOTAS, and Oleg Aksyutin, Deputy Chairman of the Management Committee – Head of Department at Gazprom, joined the event via teleconference.

A grand opening ceremony for the TurkStream gas pipeline took place today

Vladimir Putin and Recep Tayyip Erdogan. Photo by RIA Novosti

TurkStream, which is laid in the Black Sea, is a link between the gas transmission systems of Russia and Turkey. The gas pipeline has two strings with a combined throughput capacity of 31.5 billion cubic meters. The first string will deliver gas to Turkey, while the second string is intended for gas transit to southern and southeastern Europe through Turkish territory.

The pipelaying for TurkStream took 15 months and was completed ahead of schedule in November 2018. The construction of the receiving terminal near the Kiyikoy settlement in Turkey was finished in 2019.

Turkstream
Source: EWA

The starting point for feeding gas into TurkStream is the Russkaya compressor station (CS), which forms part of Russia's Unified Gas Supply System and is located near Anapa. With a capacity of 224 MW, the CS maintains the pressure required for transmitting gas along the pipeline's two strings through more than 930 kilometers up to the Turkish coast where gas enters the receiving terminal.

The TurkStream project is unique from a technological standpoint: for the first time ever, a pipe of 813 millimeters in diameter was laid at a depth of 2,200 meters.

At every stage of the project, including the operation stage, the highest standards of safety, inter alia environmental safety, are observed. Continuous environmental monitoring is performed.

A grand opening ceremony for the TurkStream gas pipeline took place today

Alexey Miller (third left) speaking at grand opening ceremony for TurkStream gas pipeline. Photo by RIA Novosti

“The launch of TurkStream is a history-making event. Firstly, taking into account exports via Blue Stream, we have paved the way for direct transit-free supplies to fully meet Turkey's needs for Gazprom's gas. Secondly, Europe now has a new and reliable route to receive Russian pipeline gas.

There is no doubt that, thanks to all of this, our cooperation with our Turkish and European partners is shifting to a new level and is going to help improve energy security in the region,” said Alexey Miller.


Copyright © 2019. All market data is provided by Barchart Solutions. Futures: at least a 10 minute delay. Information is provided 'as is' and solely for informational purposes, not for trading purposes or advice. To see all exchange delays and terms of use, please see disclaimer.

                                  CMEGroup                                     Icelogo

FEATURED COLUMNS

Editorial Comment: China eyes continued expansion of smaller-scale LNG
-Adrienne Blume
Smaller-scale liquefaction in China, the world’s second-largest LNG importer, has experienced growth in recent years as China’s government integrates more gas into the country’s energy matrix.
Executive Q&A Viewpoint: SeaOne expands South American energy options with Compressed Gas Liquid technology
-Bruce Hall
SeaOne is a midstream infrastructure and logistics company that leverages its patented Compressed Gas Liquid (CGL™) technology to lower energy costs in various markets, generating new opportunities for economic growth and environmental stewardship.


Corrosion Control for Gas Treating Amines: Technology Leads to Increased Amine Unit Efficiency

Register Now

Accelerated basin drilling activities combined with increased fugitive gas emission capture technologies have increased trace oxygen levels in midstream natural gas. Oxygen present in concentrations even as low 30-50 ppm will cause costly corrosion-related problems in plant operations and processing equipment. One area in the plant most affected by oxygen is the amine unit. Oxygen will degrade MDEA-blended amines to corrosive amino acids and heat-stable amine salts.

Learn how a new technology from BASF combined with innovation from Nalco Water can increase amine efficiency and reduce costs associated with corrosion. This new technology will inhibit the degradation of amines from oxygen attack and control corrosion in process gas, while stabilizing the amine from degradation into bicine and other heat-stable amine salts. Together with Nalco Water’s real-time amine corrosion control program, have been proven to both mitigate oxygen degradation of amine and reduce the overall corrosivity of amine units.

August 19, 2020 10:00 AM CDT

Register Now

 

Please read our Term and Conditions, Cookies Policy, and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2020 Gulf Publishing Holdings LLC.