Qatar Petroleum takes over ownership of first-ever LNG plant
Qatar Petroleum said it would take full ownership of its Qatargas 1 LNG plant when its 25-year contract with international investors including ExxonMobil Corp and Total SE expires next year.
The decision not to extend the contracts for the country’s first-ever LNG processing plan came as Qatar Petroleum (QP), the world’s top LNG producer, prepares to vastly expand its capacity in the coming years with foreign investment.
Qatargas 1, established in 1984, has an annual capacity of 10 million tonnes of LNG. It is a joint venture between QP, which holds a 65% stake with Total (10%), ExxonMobil (10%), Marubeni Corp (7.5%) and Mitsui & Co Ltd (7.5%).
Qatar Petroleum said in a statement it would not renew agreements with the companies when they expire on 31 December 2021.
“As a result, Qatar Petroleum will become the sole owner of 100% of the QG1 assets and facilities on 1 January 2022.”
International energy companies had previously hoped that partnerships with QP on existing LNG production facilities, known as trains, would be extend, albeit at different terms, analysts at Credit Suisse said in a note.
“QP had previously not indicated its approach for awarding the post-2021 contract. Now we know that when existing licenses expire, QP appears to plan without partners,” Credit Suisse said.
Reporting by Hadeel Al Sayegh; Editing by Kirsten Donovan and Richard Chang
Copyright © 2019. All market data is provided by Barchart Solutions. Futures: at least a 10 minute delay. Information is provided 'as is' and solely for informational purposes, not for trading purposes or advice. To see all exchange delays and terms of use, please see disclaimer.

FEATURED COLUMNS
Throughput optimization for pipelines and gas plants
Register Now
Many processes within oil and gas pipelines and processing plants depend on maintaining specific temperatures and pressures at which the process fluids are liquids or gases. In addition, anytime water is a component in the process fluid hydrates can form and plug piping and vessels. Learn how Sensia’s Throughput optimization solution allows operators, and control systems to “see inside” the process in real time to understand where the facility is operating with respect to critical physical constants, including the phase envelope and hydrate temperature. This insight allows for more stable operation, reduced energy expenditure and associated emissions, and greater facility throughput. Case studies will include controlling methanol injection, managing heaters, virtual sensors for sulfur recovery units and more.
April 1, 2021 10:00 AM CDT
Register Now